
问题4:
(1)锚杆方案安全文明施工费:14578805.60×6%=874728.34(元)
(2)锚杆方案人工费:(15048805.60+874728.34)×25%=3980883.49(元)
(3)锚杆方案规费:3980883.49×21%=835985.53(元)
(4)锚索方案安全文明施工费:10102250×6%=606135(元)
(5)锚索方案人工费:(10442250+606135)×25%=2762096.25(元)
(6)锚索方案规费:2762096.25×21%=580040.21(元)
